
{"id":10015,"date":"2021-08-19T14:34:24","date_gmt":"2021-08-19T07:34:24","guid":{"rendered":"https:\/\/oilgascourse.com\/ogc\/?page_id=10015"},"modified":"2021-08-19T14:57:33","modified_gmt":"2021-08-19T07:57:33","slug":"engineering-for-non-engineers-comprehensive-training","status":"publish","type":"page","link":"https:\/\/oilgascourse.com\/ogc\/supply-chain-management\/engineering-for-non-engineers-comprehensive-training\/","title":{"rendered":"Engineering for Non Engineers Comprehensive Training"},"content":{"rendered":"<p>DEVELOP Training Center menyelenggarakan Kelas <strong>Engineering for Non Engineers Comprehensive Training<\/strong> yang akan mengajarkan kepada Anda tentang:<\/p>\n<blockquote>\n<ul>\n<li>Procurement Engineer Fundamentals<\/li>\n<li>Multidiscipline BOQ\/MTO\/Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/li>\n<li>Process Equipment,Key Components&amp;Operating Philosophy<\/li>\n<li>Instrument Equipment (PSV,Flow Element,Control Valve), Key Components&amp;Operating Philosophy<\/li>\n<li>Process Control System, Key Components&amp;Operating Philosophy<\/li>\n<li>Process Plant Safety&amp;Key Components<\/li>\n<li>Static\/Rotating Machines (Pump,Compressor,Boiler)&amp;Distribution Terminal (TANK,Jetty,Vessels)<\/li>\n<li>Piping Equipment&amp;Materials<\/li>\n<li>Electrical Equipment,Key Components&amp;Safety Operation<\/li>\n<li>Operation Maintenance Service related to Parts Purchasing<\/li>\n<li>Vendor Documentation Provision related to Parts Purchasing<\/li>\n<li>Project Control Engineering untuk Procurement&amp;Construction<\/li>\n<li>Work Package Estimates&amp;Contingency Reserves Procurement Engineering<\/li>\n<li><em>dll<\/em><\/li>\n<\/ul>\n<\/blockquote>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-10017\" src=\"https:\/\/oilgascourse.com\/ogc\/wp-content\/uploads\/oilgascourse-003.jpg\" alt=\"DEVELOP oilgascourse.com Engineering for Non Engineers Comprehensive Workshop\" width=\"300\" height=\"300\" srcset=\"https:\/\/oilgascourse.com\/ogc\/wp-content\/uploads\/oilgascourse-003.jpg 300w, https:\/\/oilgascourse.com\/ogc\/wp-content\/uploads\/oilgascourse-003-150x150.jpg 150w, https:\/\/oilgascourse.com\/ogc\/wp-content\/uploads\/oilgascourse-003-65x65.jpg 65w, https:\/\/oilgascourse.com\/ogc\/wp-content\/uploads\/oilgascourse-003-75x75.jpg 75w, https:\/\/oilgascourse.com\/ogc\/wp-content\/uploads\/oilgascourse-003-120x120.jpg 120w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>DEVELOP menerapkan Syllabus Kelas <strong>Engineering for Non Engineers Comprehensive Workshop <\/strong>dengan tahap-tahap pembelajaran berkualitas sbb :<\/p>\n<blockquote><p><strong>Session 1 Process Engineering, Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/strong><\/p>\n<p>Skill Focus:<\/p>\n<ul>\n<li>Process Equipment<\/li>\n<li>Process Description<\/li>\n<li>Applicable Standards&amp;Codes<\/li>\n<li>Process Operating and Control Philosophy<\/li>\n<li>Equipment Functional Description<\/li>\n<li>Common Operating Problems<\/li>\n<li>Operation Maintenance Service related to Parts Purchasing<\/li>\n<li>Vendor Documentation Provision related to Process Parts Purchasing<\/li>\n<li>Case Study : Separator BOQ\/Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/li>\n<\/ul>\n<p><strong>Session 2 Process Safety Engineering, Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/strong><\/p>\n<p>Skill Focus:<\/p>\n<ul>\n<li>Functional Safety System Basics &amp; Management Overview<\/li>\n<li>Basic Components of Control System &amp; Parameters<\/li>\n<li>Safety Instrumented System<\/li>\n<li>Emergency Shutdown System<\/li>\n<li>Risk Reduction<\/li>\n<li>Control System&amp;Operating Equipment<\/li>\n<li>Operation Maintenance Service related to Process Safety Parts Purchasing<\/li>\n<li>Vendor Documentation Provision related to Process Safety Parts Purchasing<\/li>\n<li>Case Study : Fire&amp;Gas System BOQ\/Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/li>\n<\/ul>\n<p><strong>Session 3 Instrument Engineering, Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/strong><\/p>\n<p>Skill Focus:<\/p>\n<ul>\n<li>Instrumentation Equipment<\/li>\n<li>Key components<\/li>\n<li>operation Principles<\/li>\n<li>Applicable Standards&amp;Codes<\/li>\n<li>Operation safety related<\/li>\n<li>Process Control<\/li>\n<li>Operation Maintenance Service related to Instrument Parts Purchasing<\/li>\n<li>Vendor Documentation Provision related to Instrument Parts Purchasing<\/li>\n<li>Case Study : Pressure Relief Valve BOQ\/Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/li>\n<\/ul>\n<p><strong>Session 4 Mechanical Engineering, Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/strong><\/p>\n<p>Skill Focus:<\/p>\n<ul>\n<li>Mechanical Equipment<\/li>\n<li>The different types of mechanical equipment<\/li>\n<li>Key components<\/li>\n<li>Principles of operation<\/li>\n<li>Applicable Standards&amp;Codes<\/li>\n<li>Related safety, operating and reliability issues<\/li>\n<li>Static &amp; Rotating Machines Used in Plant<\/li>\n<li>Operation Maintenance Service related to Mechanical Parts Purchasing<\/li>\n<li>Vendor Documentation Provision related to Mechanical Parts Purchasing<\/li>\n<li>Case Study : Pump BOQ\/Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/li>\n<\/ul>\n<p><strong>Session 5 Distribution Terminal Engineering, Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/strong><\/p>\n<p>Skill Focus:<\/p>\n<ul>\n<li>Tank Farm<\/li>\n<li>Tank Farm Hazards<\/li>\n<li>Fixed Roof Tanks<\/li>\n<li>Floating Roof Tanks<\/li>\n<li>Applicable Standards&amp;Codes<\/li>\n<li>Operation Maintenance Service related to Distribution Terminals Parts Purchasing<\/li>\n<li>Vendor Documentation Provision related to Distribution Terminals Parts Purchasing<\/li>\n<li>Case Study : Storage Tank BOQ\/Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/li>\n<\/ul>\n<p><strong>Session 6 Piping Engineering, Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/strong><\/p>\n<p>Skill Focus:<\/p>\n<ul>\n<li>Piping Equipment<\/li>\n<li>PIPING MATERIAL<\/li>\n<li>Flange Type&amp;Rating (Weld Neck Flange, Threaded Flange, Socked Weld Flange, Slip On Flange, Lap Join Flange, Reducing Flange, Blind Flange, Orifice Flange etc)<\/li>\n<li>Relief Valve&amp;Control Valve<\/li>\n<li>Horizontal Vessel\/Accumulator&amp;Vertical Vessel<\/li>\n<li>Heaters\/Boilers<\/li>\n<li>Piping Instrumentation (Gauges,Controllers,Alarms,Indicators&amp;Recorder)<\/li>\n<li>P&amp;ID Transposition<\/li>\n<li>PIPING ARRANGEMENT DRAWING (GA) \/ PIPING LAYOUT, SECTION &amp; ELEVATION DRAWING<\/li>\n<li>Piping Index Drawing&amp;Vendor Drawing (Equipment Drawing)<\/li>\n<li>Layout Procedure<\/li>\n<li>Piping Section&amp;Elevation<\/li>\n<li>Piping Specification Datasheet for Plants Development&amp;Operation<\/li>\n<li>Applicable Standards&amp;Codes<\/li>\n<li>Operation Maintenance Service related to Piping Parts Purchasing<\/li>\n<li>Vendor Documentation Provision related to Piping Parts Purchasing<\/li>\n<li>Case Study : Piping BOQ\/Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/li>\n<\/ul>\n<p><strong>Session 7 Electrical Engineering,Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/strong><\/p>\n<p>Skill Focus:<\/p>\n<ul>\n<li>Electrical Equipment<\/li>\n<li>Single Line Diagram (SLD)\/One Line Diagram (OLD)<\/li>\n<li>Load Flow<\/li>\n<li>Impedansi Saluran Transmisi<\/li>\n<li>Optimal Capacitor Placement<\/li>\n<li>LF-Default&amp;Load Flow<\/li>\n<li>SLD Starting Motor<\/li>\n<li>Parameter Arus,Tegangan,Frekuensi&amp;Daya<\/li>\n<li>Short Circuit<\/li>\n<li>Applicable Standards&amp;Codes<\/li>\n<li>Hubung Singkat ANSI<\/li>\n<li>Hubung Singkat IEC<\/li>\n<li>Operation Maintenance Service related to Electrical Parts Purchasing<\/li>\n<li>Vendor Documentation Provision related to Electrical Parts Purchasing<\/li>\n<li>Case Study : Transformers BOQ\/Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement<\/li>\n<\/ul>\n<p><strong>Session 8 Project Control Engineering, Procurement-Construction Cost Variance&amp; Earned Value<\/strong><\/p>\n<p>Skill Focus:<\/p>\n<ul>\n<li>Schedule&amp;Work Capital CAPEX\/OPEX Control (Estimate At Completion&amp;Budget At Completion)<\/li>\n<li>Pengendalian Procurement<\/li>\n<li>Pengawasan Construction<\/li>\n<li>Pengendalian Precommissioning&amp;Commissioning<\/li>\n<li>Budget Determination, Cost Planning&amp;Spending Plan<\/li>\n<li>Cost Baseline (Management Reserves, Work Package Cost Estimates\/Contingency Reserves, Activity Cost Estimates)<\/li>\n<li>Long Lead,Bulk Material<\/li>\n<li>Operation Maintenance Service Scheduling&amp;Cost related to Parts Purchasing<\/li>\n<li>Case Study (can be customized to match with Project\/Operation goals) : Procurement Schedule&amp;Cost Variance, Schedule-Budget\/Cost Performance&amp; Earned Value<\/li>\n<\/ul>\n<\/blockquote>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-9399\" src=\"https:\/\/oilgascourse.com\/ogc\/wp-content\/uploads\/DEVELOP-Renewable-Energy-PLTSa-wm-400.jpg\" alt=\"\" width=\"400\" height=\"397\"><\/p>\n<p>Materi Training dirancang khusus oleh para praktisi Engineers sesuai dengan experience dan solid knowledge&nbsp; mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.<\/p>\n<p>Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek&amp;Plant Operation nyata.<\/p>\n\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f11782-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"11782\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/ogc\/wp-json\/wp\/v2\/pages\/10015#wpcf7-f11782-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"11782\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.1.5\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f11782-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<p><b><mark>QUICK REGISTRATION<\/mark><\/b>\n<\/p>\n<p><label> Name<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" autocomplete=\"name\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span> <\/label>\n<\/p>\n<p><label> Email<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" autocomplete=\"email\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span><\/label>\n<\/p>\n<p><label> Phone<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-phone\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"tel\" name=\"your-phone\" \/><\/span><\/label>\n<\/p>\n<p><label> Special Message (optional)<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" name=\"your-message\"><\/textarea><\/span> <\/label>\n<\/p>\n<p><div id=\"cf7sr-69e344745bde2\" class=\"cf7sr-g-turnstile\" data-theme=\"auto\" data-language=\"en\" data-size=\"normal\" data-appearance=\"always\" data-sitekey=\"0x4AAAAAABiju8q2PIxbSWz0\"><\/div><span class=\"wpcf7-form-control-wrap cf7sr-turnstile\" data-name=\"cf7sr-turnstile\"><input type=\"hidden\" name=\"cf7sr-turnstile\" value=\"\" class=\"wpcf7-form-control\"><\/span>\n<\/p>\n<p><input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"Submit\" \/>\n<\/p><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>DEVELOP Training Center menyelenggarakan Kelas Engineering for Non Engineers Comprehensive Training yang akan mengajarkan kepada Anda tentang: Procurement Engineer Fundamentals Multidiscipline BOQ\/MTO\/Material Take Off\/Datasheet, Parts Selection &amp;Practical Procurement Process Equipment,Key Components&amp;Operating Philosophy Instrument Equipment (PSV,Flow Element,Control Valve), Key Components&amp;Operating Philosophy Process Control System, Key Components&amp;Operating Philosophy Process Plant Safety&amp;Key Components Static\/Rotating Machines (Pump,Compressor,Boiler)&amp;Distribution Terminal (TANK,Jetty,Vessels) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10017,"parent":8678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-10015","page","type-page","status-publish","has-post-thumbnail","hentry","entry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/oilgascourse.com\/ogc\/wp-json\/wp\/v2\/pages\/10015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oilgascourse.com\/ogc\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/oilgascourse.com\/ogc\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/oilgascourse.com\/ogc\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/oilgascourse.com\/ogc\/wp-json\/wp\/v2\/comments?post=10015"}],"version-history":[{"count":0,"href":"https:\/\/oilgascourse.com\/ogc\/wp-json\/wp\/v2\/pages\/10015\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/oilgascourse.com\/ogc\/wp-json\/wp\/v2\/pages\/8678"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oilgascourse.com\/ogc\/wp-json\/wp\/v2\/media\/10017"}],"wp:attachment":[{"href":"https:\/\/oilgascourse.com\/ogc\/wp-json\/wp\/v2\/media?parent=10015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}