DEVELOP Training Center (TM) menyelenggarakan Workshop Construction Management for Oil&Gas yang sangat berguna untuk mendapatkan skill tentang :
- Penerapan Manajemen Proyek mencakup aspek Engineering,Procurement,Construction Installation,Precomissioning,Plant Start Up&Construction Handover di Industri Migas
- Pengalaman praktis tentang bagaimana mengelola proyek Konstruksi di Industri Migas
- Mengetahui problem solving dalam mengelola Proyek Konstruksi Migas
- Memahami Organisasi Proyek Kontruksi Migas
- Menerapkan HSE Management System (Sistem Manajemen K3LH) pada Proyek Konstruksi Migas
- Menerapkan Quality Management System pada Proyek Konstruksi Migas
DEVELOP mengimplementasikan Syllabus Training Construction Management for Oil&Gas dengan tahap-tahap pembelajaran berkualitas sbb :
Sesi 1-2 Pengenalan Obyek Kontrak,Tahapan Pelaksanaan Proyek,Project Management ,Detailed Engineering,Procurement
Skill Focus :
- PENGENALAN OBYEK KONTRAK
- Oil & Gas Exploration & Production
- Contoh Plot Plan (On Shore Processing)
- TAHAPAN PELAKSANAAN PROYEK
- ITB, ADDENDUM, CLARIFICATION& CONTRACT
- Project Schedule& Organization Chart (key persons can not be changed)
- Legal aspect (lump sump, penalty, change scope, dll)
- Master Schedule,90 days Schedule,Milestone schedule,Mechanical Completion Schedule&Factory Acceptance schedule
- PROJECT MANAGEMENT TEAM ACTIVITIES
- Kualifikasi Personil as per bid proposal
- KOM (Kick-Off Meeting).Deliverable List,Milestone & Baseline Schedule
- PEP (Project Execution Plan) & Controlling Cost (Contract, contingency, buyout, vs actual)
- PROJECT MANAGEMENT TEAM
- Project Sponsor,Project Director&Project Manager
- Precomm/comm manager
- QA/QC Manager&HSE Manager
- Project Control /Cost Control Manager
- DETAILED ENGINEERING
- Engineering Deliverables
- Finalized the philosophy (control, fire, operation)
- Finalized Topography, soil investigation
- First submission : PID, PFD, Plot plan, Equipment List and data sheet,Piling plan dwg,Building Drawing,line list,Piping plan,U/G Composite drawing,Standard drawing,cable/tray lay out,General Spec ,Safety Review & Studies (HAZOPS/HAZID/SIL),Detailed Engineering : Process, Process Safety, Mechanical, Piping, Electrical, Instrumentation, Structural, Piping, Civil, dll,Control Engineering Quality
- Study Kasus & Discussion
- PROCUREMENT
- Master list
- Handover material/barang/spare/special tools ke Material control (Unpack, inspection, MRR, NCR)
- PO terhadap emergency material (Field Material Request)
Sesi 3-4 Construction / Onshore Fabrication & Project Control
Skill Focus :
- CONSTRUCTION / ONSHORE FABRICATION
- Material Mobilization Plan (as per CRD)
- Constructability reviews (rigging study, method, tools)
- Waste Management
- Emergency Response Management
- Mechanical Completion
- Setup Construction (Onshore Fabrication) Team
- Construction Required Date
- Temporary Drainage Plan
- Temporary Facility & Utility Required
- PROJECT CONTROL
- Perencanaan, penjadwalan (scheduling), dan alokasi sumber daya menggunakan software Mengukur kemajuan proyek dan pelaporannya (S-Curve)
- Project Control/Services (Weight Factor,Milestone & Progress Measurement,(see JTB),Overall Progress “S” Curve,90 DAYS SCHEDULE/ Menampilkan 90 days target schedule & Cost control/Cash Flow Prediction)
- Document control
- PRE-COMMISSIONING & COMMISSIONING SUPPORT
- Prosedur Pre-comm Commissioning & precomm/comm. Check sheet
- System & Sub-system,HAZOPS/Hazid review
- OPERATIONS READINESS & ASSURANCE
- HAZOPs, HAZIDs, SIL & Risk Assessments
- Constructability, Accessibility & Maintainability Reviews
- Operations Assurance Team
- QUALITY ASSURANCE & QUALITY CONTROL
- QA/QC team & Manpower distribution
- QAQC Organization
- QAQC Manning Schedule
- Site QA/QC Team
- Project Quality Plan (QA/QC deliverables ,Inspection and test plans,Non-Conformances,Quality Audit )
- HEALTH SAFETY ENVIRONMENTAL (HSE)
- Safety induction
- Pre job safety meeting (PJSM)/JSA
- HSE Audit & Inspection, Site Inspection, Pre Delivery Equipment Inspection
- Control terhadap waste termasuk contract B3 waste handling company
- Membuat Possibility Risk List
- Study Kasus & Discussion
Materi Training dirancang khusus oleh para praktisi & Project Managers sesuai dengan experience dan solid knowledge mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.
QUICK REGISTER :